{
  "docId": "019dd923-5ca1-7489-b636-720e80254801",
  "docSlug": "f3e36b18b812595c",
  "documentTitle": "Doing business in the Philippines 2021",
  "authorId": "Deloitte",
  "authorName": "Deloitte",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 20,
  "pageCount": 67,
  "prevPage": 19,
  "nextPage": 21,
  "slideType": "geographic_map",
  "function": "establish_context",
  "density": "overcrowded",
  "nDataPoints": 8,
  "notes": "Includes a map of the Philippines with callouts for specific infrastructure projects.",
  "elementsJson": [
    "headline_text",
    "paragraph",
    "map",
    "photo"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b636-720e80254801/20",
  "deckHref": "/decks/019dd923-5ca1-7489-b636-720e80254801",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b636-720e80254801.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b636-720e80254801#slide-20",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "A key pillar of the incumbent administration's economic plan is the Build, Build, Build Program, which aims to improve transport efficiency, market opportunities, and overall productivity.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-c23a-740d-9799-17cb67026e95",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.45,
        "w": 0.18,
        "x": 0.02,
        "y": 0.45
      },
      "kind": "image",
      "text": null,
      "attrs": null,
      "subkind": "map",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f3e4eac5-faf4-4f34-8a61-fa3dd61afb75",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.9,
        "w": 0.45,
        "x": 0.53,
        "y": 0.08
      },
      "kind": "image",
      "text": null,
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ea75ba13-30aa-4d39-bb3b-ebc790d78189",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.45,
        "w": 0.4,
        "x": 0.145,
        "y": 0.48
      },
      "kind": "list",
      "text": "Luzon: The US$6.8-billion Metro Manila Subway (Phase 1); The upgrade and repair of the Ninoy Aquino International Airport. Visayas: Cebu Monorail System; Panay-Guimaras Negros Bridge (Phase 1). Mindanao: Mindanao Railway; Davao City Expressway.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "93d08217-aa06-47a3-b61c-b417448af28b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Infrastructure budget: US$22.3 billion",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-c23a-740d-9799-19a818e1f2a2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.12,
        "w": 0.41,
        "x": 0.037,
        "y": 0.305
      },
      "kind": "paragraph",
      "text": "According to the latest list provided by the National Economic Development Authority, the flagship infrastructure projects under Build, Build, Build have grown from 75 to 119 at a cost of PhP4.7 trillion (US$95.3 billion) as of May 2021. Apart from projects in Luzon, Visayas, and Mindanao, several projects have also been tagged as nationwide. With a focus on mass transportation, some of the highlighted projects per island under Build, Build, Build are:",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6df0dc12-c3cf-4696-9729-0c5c2ba1c4de",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.41,
        "x": 0.037,
        "y": 0.12
      },
      "kind": "paragraph",
      "text": "A key pillar of the incumbent administration's economic plan is the Build, Build, Build Program, which aims to improve transport efficiency, market opportunities, and overall productivity by ushering in the Philippines' ‘golden age of infrastructure.’ In 2021, the government allocated PhP1.1 trillion (US$22.3 billion) of the total national budget to the project. The higher infrastructure budget will account for 5.9 percent of the 2021 gross domestic product according to the Development Budget Coordination Committee.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ad4007e7-2750-4005-a955-13355d540d5c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.15,
        "x": 0.025,
        "y": 0.035
      },
      "kind": "title",
      "text": "Build, Build, Build",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "760d3810-9a10-4f42-9d5d-a9c7834c0b58",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Infrastructure budget",
      "numberRaw": "US$22.3 billion",
      "numberKind": "money",
      "actionTitle": "Build, Build, Build",
      "calloutText": "A key pillar of the incumbent administration's economic plan is the Build, Build, Build Program, which aims to improve transport efficiency, market opportunities, and overall productivity.",
      "numberScale": "b",
      "numberValue": 22.3,
      "metricFamily": "market_size",
      "numberCurrency": "$"
    }
  ],
  "tools": [
    {
      "name": "Action Titles",
      "slug": "action-titles",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019de8a0-4122-712e-a13b-c683b7cccc27",
      "evidence": "action-title element flagged in inventory",
      "confidence": 60
    },
    {
      "name": "Concrete Language",
      "slug": "concrete-language",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "019de8a0-414f-7090-9cdf-5a3202c2d90b",
      "evidence": "$22.3B budget anchored to specific regional projects on map",
      "confidence": 65
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 38,
      "from": 12,
      "beatId": "019de8a0-39b1-754d-b24c-2d5d25789907",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Solution & Approach",
      "beatSlug": null,
      "evidence": "Legislative response (Bayanihan, CREATE) and sector recovery deep-dives",
      "position": 3,
      "confidence": 70,
      "parentBeatName": null,
      "parentBeatSlug": null
    },
    {
      "to": 38,
      "from": 4,
      "beatId": "019de8a0-3a54-7695-a301-0a20ecde92ec",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Facts (What)",
      "beatSlug": null,
      "evidence": "Macro stats and sector descriptions",
      "position": 1,
      "confidence": 55,
      "parentBeatName": null,
      "parentBeatSlug": null
    }
  ],
  "loops": [
    {
      "to": 23,
      "from": 20,
      "name": "Zoom In",
      "slug": "06-zoom-in",
      "bestFor": "Technical deep-dives, case studies, detailed analysis",
      "matchId": "019de8a0-3b92-746d-a706-d8a289a9ea5f",
      "evidence": "p20-21 program overview then p22-23 specific subway project cost/timeline/map",
      "position": 6,
      "objective": "Zoom from BBB program into Metro Manila Subway case study",
      "structure": "The Big Picture -> Key Area of Focus -> Specific Detail -> Implication",
      "confidence": 80,
      "description": "Start broad, then progressively focus on specific details that prove your point"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}