{
  "docId": "019dd923-5ca1-7489-b635-02cc8d381457",
  "docSlug": "6dcd3449fa2bada6",
  "documentTitle": "Draft BCG proposal Mercury Genesis Energy",
  "authorId": "BCG",
  "authorName": "BCG",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "portrait",
  "aspectRatio": 0.707,
  "pageNumber": 2,
  "pageCount": 11,
  "prevPage": 1,
  "nextPage": 3,
  "slideType": "appendix_disclosure",
  "function": "front_matter",
  "density": "dense",
  "nDataPoints": 4,
  "notes": "Includes BCG logo and page number 2.",
  "elementsJson": [
    "paragraph",
    "bullet_list",
    "numbered_list"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b635-02cc8d381457/2",
  "deckHref": "/decks/019dd923-5ca1-7489-b635-02cc8d381457",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b635-02cc8d381457.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b635-02cc8d381457#slide-2",
  "components": [
    {
      "bbox": {
        "h": 0.2,
        "w": 0.77,
        "x": 0.13,
        "y": 0.23
      },
      "kind": "list",
      "text": "No competitively sensitive information... The outputs included in BCG's report... There is no contract, arrangement, or understanding...",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d6fe32fb-35f7-4ab6-8a86-d1a73e5b2cb9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.8,
        "x": 0.1,
        "y": 0.72
      },
      "kind": "list",
      "text": "1. Through direct decarbonisation of the electricity sector, which represents ~5% of national emissions. 2. Through electrification of the transport, industry and building sectors, which represent ~30% of national emissions.",
      "attrs": null,
      "subkind": "numbered",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "fc1a1b88-cbc3-414f-8275-eaa62c7e1324",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.8,
        "x": 0.1,
        "y": 0.57
      },
      "kind": "paragraph",
      "text": "Domestic decarbonisation context: The New Zealand Government is seeking to decarbonise the economy to achieve its 2030 Paris Climate Target and net zero 2050 target.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2abd271f-02f4-467e-b80d-26422d9352af",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.8,
        "x": 0.1,
        "y": 0.17
      },
      "kind": "paragraph",
      "text": "We reiterate from the outset that both BCG, and your Companies, are very conscious of the competition law (Commerce Act) sensitivities inherent in an industry group procuring a report.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "41fdc7b1-57bf-4a9e-8fd9-addb5bcce4aa",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.8,
        "x": 0.1,
        "y": 0.82
      },
      "kind": "paragraph",
      "text": "The sector has made a significant head start on ensuring a strong pipeline of renewable generation projects. ~650 MW of generation projects are currently under construction, ~900 MW are in mid-stage development, and a further ~18,000 MW are at early/enquiry stage.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "54215227-eb3a-4c58-aed1-e4c6ea0c36dc",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.5,
        "x": 0.1,
        "y": 0.53
      },
      "kind": "title",
      "text": "Our understanding of the context and the problem",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cd2e4578-ea68-4933-a571-9c09bbf43a0e",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "MECE Principle",
      "slug": "mece-principle",
      "agent": "Architect",
      "layer": "block",
      "matchId": "019dd95a-1321-706c-9a5f-534b85b0c25b",
      "evidence": "Two distinct contribution paths: direct decarbonisation (5%) vs. electrification of other sectors (30%)",
      "confidence": 78
    },
    {
      "name": "SCQA Framework",
      "slug": "scqa-framework",
      "agent": "Architect",
      "layer": "block",
      "matchId": "019dd95a-1321-706c-9a5f-556eac5ab87d",
      "evidence": "Section header '1. Our understanding of the context and the problem' frames Situation before Complication",
      "confidence": 70
    },
    {
      "name": "Concrete Language",
      "slug": "concrete-language",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "019dd95a-1321-706c-9a5f-4e2fb37cbead",
      "evidence": "Specific figures: ~5%, ~30%, 650MW, 900MW, 18,000MW, 2030 / 2050 targets",
      "confidence": 85
    },
    {
      "name": "Problem Statement Canvas",
      "slug": "problem-statement-canvas",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "5831106e-0669-44d9-9a26-e08b683f3e39",
      "evidence": "paragraph/paragraph: The pathway would be converted into a credible roadmap for decarbonisation of the energy system from 2025 to 2040, bringing together the whole-of-electricity-sector view, to form an independent view",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 2,
      "from": 1,
      "beatId": "019dd95a-0702-74a3-87db-30e9cf7588d5",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Situation & Context",
      "beatSlug": "consultants-gambit-situation-context",
      "evidence": "Cover letter + 'Our understanding of the context and the problem' section header",
      "position": 1,
      "confidence": 92,
      "parentBeatName": "Setup",
      "parentBeatSlug": "setup"
    }
  ],
  "loops": [
    {
      "to": 3,
      "from": 2,
      "name": "Aha Moment",
      "slug": "03-aha-moment",
      "bestFor": "Data-heavy sections, research findings, analytical arguments",
      "matchId": "019dd95a-088b-72c8-b7e3-54bf33ed34ca",
      "evidence": "Page 2 lists positive activity (650MW, 900MW, 18,000MW projects); page 3 reveals the gap as the problem statement",
      "position": 1,
      "objective": "Reveal that despite heavy sector activity, no coherent whole-of-sector view exists",
      "structure": "The Problem/Question -> What the Data Shows -> The Insight",
      "confidence": 80,
      "description": "Establish a tension, present data, then deliver the insight that changes everything"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}