{
  "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
  "docSlug": "0798c0fb1aaf0664",
  "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
  "authorId": "BCG",
  "authorName": "BCG",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.445,
  "pageNumber": 64,
  "pageCount": 482,
  "prevPage": 63,
  "nextPage": 65,
  "slideType": "roadmap",
  "function": "present_framework",
  "density": "sparse",
  "nDataPoints": 0,
  "notes": "The slide outlines a standard BCG-style procurement category management process.",
  "elementsJson": [
    "process_diagram"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/64",
  "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-64",
  "components": [
    {
      "bbox": {
        "h": 0.1,
        "w": 0.9,
        "x": 0.05,
        "y": 0.2
      },
      "kind": "diagram",
      "text": "Forberedelse, Kategorianalyse, Kategoristrategi, Kategori-roadmap",
      "attrs": null,
      "subkind": "process",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bfd19837-0043-4f10-8909-110d14b499d3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.55,
        "w": 0.9,
        "x": 0.05,
        "y": 0.35
      },
      "kind": "list",
      "text": "Detailed activities for Forberedelse, Kategorianalyse, Kategoristrategi, and Kategori-roadmap phases.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e5ac2043-d8bf-4f30-831d-59f2275bda24",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.1,
        "x": 0.05,
        "y": 0.95
      },
      "kind": "source-note",
      "text": "Kilde: BCG",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8e5a0689-f3f3-404a-b157-5742aeaa4b15",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.9,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "Kategoristyring struktureret langs fire centrale trin som skaber grundlag for kommercielle overvejelser i anskaffelsesprocessen",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "666a183f-491a-4a10-b0ba-ef35c674a150",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Visual Hierarchy",
      "slug": "visual-hierarchy",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019dd95a-12a5-7665-b700-d2835db23d59",
      "evidence": "Four-step kategoristyring framework with arrows.",
      "confidence": 75
    }
  ],
  "frameworks": [
    {
      "name": "Category Management Framework",
      "slug": null,
      "matchId": "019dd95a-1ca6-71be-9e56-ccc39483ee09",
      "evidence": "Kategoristyring struktureret langs fire centrale trin.",
      "confidence": 84
    },
    {
      "name": "Category Management Process",
      "slug": null,
      "matchId": "dbd74190-5ce5-4c0a-8bfa-2b754b1f8912",
      "evidence": "Four-step process flow (Forberedelse, Analyse, Strategi, Roadmap)",
      "confidence": 0.9
    }
  ],
  "arcBeats": [
    {
      "to": 321,
      "from": 19,
      "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Solution & Approach",
      "beatSlug": "consultants-gambit-solution-approach",
      "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
      "position": 3,
      "confidence": 92,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    },
    {
      "to": 165,
      "from": 9,
      "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Facts (What)",
      "beatSlug": "triple-take-the-facts-what",
      "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
      "position": 1,
      "confidence": 70,
      "parentBeatName": "Setup",
      "parentBeatSlug": "setup"
    }
  ],
  "loops": [
    {
      "to": 82,
      "from": 54,
      "name": "Maturity Curve",
      "slug": "36-maturity-curve",
      "bestFor": "Digital transformation, capability building, benchmarking",
      "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
      "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
      "position": 3,
      "objective": "Build kategoristyring capability via maturity model gaps",
      "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
      "confidence": 86,
      "description": "Show where you are on a progression and what it takes to reach the next level"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}