{
  "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
  "docSlug": "0798c0fb1aaf0664",
  "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
  "authorId": "BCG",
  "authorName": "BCG",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.445,
  "pageNumber": 110,
  "pageCount": 482,
  "prevPage": 109,
  "nextPage": 111,
  "slideType": "diagnosis",
  "function": "diagnose",
  "density": "dense",
  "nDataPoints": 0,
  "notes": "The slide uses a numbered list to map specific IT enablers to their corresponding pain points.",
  "elementsJson": [
    "headline_text",
    "numbered_list",
    "screenshot",
    "callout_box"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/110",
  "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-110",
  "components": [
    {
      "bbox": {
        "h": 0.08,
        "w": 0.6,
        "x": 0.2,
        "y": 0.85
      },
      "kind": "callout",
      "text": "Need to address the IT maturity of both the business side and the IT providers in order to make new model work",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "06dbb08c-6ed3-493c-99eb-55c856f7649c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "callout",
      "text": "Without fixing the IT enablers, any improvement will likely only have a short-term impact",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-a677-7039-bfd8-af5e17114b26",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.35,
        "x": 0.04,
        "y": 0.38
      },
      "kind": "image",
      "text": "Overview of six key IT enablers",
      "attrs": null,
      "subkind": "screenshot",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bd31dc0f-5f9a-47f4-842b-e16cea7f19a7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.5,
        "x": 0.45,
        "y": 0.25
      },
      "kind": "list",
      "text": "1 Governance: Overlapping and unclear roles\n2 Architecture: Small and fragmented\n3 IT security: Some unsecure local solutions\n4 Procurement: Numerous loopholes\n5 Projects: Immature steering\n6 Business/IT: Unclear and slow interface",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0809b235-78d3-4f0d-a8be-af1dd1d11dab",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.1,
        "x": 0.04,
        "y": 0.95
      },
      "kind": "source-note",
      "text": "Source: Project team",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "20bd689e-aa9b-44db-a2de-728d0d18abb0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.9,
        "x": 0.04,
        "y": 0.1
      },
      "kind": "title",
      "text": "Without fixing the IT enablers, any improvement will likely only have a short-term impact",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bff27ebd-7ff6-48de-ac64-df0b80692efc",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.9,
        "x": 0.04,
        "y": 0.05
      },
      "kind": "title",
      "text": "Moreover, need to ensure that core IT enablers are in place",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "58e04007-a2d5-42d4-b69f-c527b848c8ef",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [
    {
      "name": "diagnostic-test",
      "slug": null,
      "matchId": "1d72f64d-e293-4307-b3b7-6ad09ba600af",
      "evidence": "The slide maps six IT enablers to specific organizational pain points.",
      "confidence": 0.9
    }
  ],
  "arcBeats": [
    {
      "to": 321,
      "from": 19,
      "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Solution & Approach",
      "beatSlug": "consultants-gambit-solution-approach",
      "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
      "position": 3,
      "confidence": 92,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    },
    {
      "to": 165,
      "from": 9,
      "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Facts (What)",
      "beatSlug": "triple-take-the-facts-what",
      "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
      "position": 1,
      "confidence": 70,
      "parentBeatName": "Setup",
      "parentBeatSlug": "setup"
    }
  ],
  "loops": [
    {
      "to": 148,
      "from": 98,
      "name": "Quick Win Big Bet",
      "slug": "47-quick-win-big-bet",
      "bestFor": "Transformation planning, 100-day plans, resource allocation",
      "matchId": "019dd95a-088b-72c8-b7e2-54fbecd2dba5",
      "evidence": "Process in waves (p.112) + decision required on option (p.115) + 200-220 mil. recommended.",
      "position": 5,
      "objective": "Sequence IT consolidation in waves with two option scenarios",
      "structure": "The Full List -> Quick Wins (Low effort, High impact) -> Big Bets (High effort, High impact) -> Sequenced Roadmap",
      "confidence": 84,
      "description": "Separate initiatives into immediate wins and longer-term strategic bets"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}