{
  "docId": "019dd923-5ca1-7489-b634-bc8e3e952c51",
  "docSlug": "bc9c22881d997435",
  "documentTitle": "Reshaping NYCHA support functions",
  "authorId": "BCG",
  "authorName": "BCG",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.401,
  "pageNumber": 83,
  "pageCount": 112,
  "prevPage": 82,
  "nextPage": 84,
  "slideType": "roadmap",
  "function": "plan_implementation",
  "density": "dense",
  "nDataPoints": 6,
  "notes": null,
  "elementsJson": [
    "bullet_list",
    "other"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b634-bc8e3e952c51/83",
  "deckHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51#slide-83",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "JIT material distribution model with accountability and minimal inventory",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-acbb-7389-93c3-3cfb372f449f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.65,
        "x": 0.27,
        "y": 0.0017
      },
      "kind": "list",
      "text": "Methodology: Identify pain points in supply chain / distribution model and related processes; Understand alternative models for potential improvement opportunities",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "19add08e-0551-44a6-b59f-3fe1ac6df781",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.65,
        "x": 0.27,
        "y": 0.007
      },
      "kind": "list",
      "text": "Path forward: Continue execution of storeroom professionalization; Continue SKU reduction; Develop technology to tie material requirements to work orders; Implement performance management; Begin implementation of JIT suppliers",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "91b6aa0c-6df5-4099-b7c0-e114d97203a4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.65,
        "x": 0.27,
        "y": 0.004200000000000001
      },
      "kind": "list",
      "text": "Future state: JIT material distribution model with accountability and minimal inventory; Warehouse SKUs reduced from 8K to 2K; Store room SKUs reduced from 1K to 300; Savings of $6M-$9M through reductions of ~40-45 FTEs",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f8475bfe-1579-4cc3-8f6e-908c2eb144c6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Cost savings: $6M-$9M",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-acbb-7389-93c3-4059e2a66ad9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.3,
        "x": 0.04,
        "y": 0.08
      },
      "kind": "title",
      "text": "Supply chain (II/II)",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "47a861da-58b0-4cc1-9fc0-78286758fc9d",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Cost savings",
      "numberRaw": "$6M-$9M",
      "numberKind": "money",
      "actionTitle": null,
      "calloutText": "JIT material distribution model with accountability and minimal inventory",
      "numberScale": "m",
      "numberValue": 6,
      "metricFamily": "cost_savings",
      "numberCurrency": "$"
    }
  ],
  "tools": [
    {
      "name": "Before-After-Bridge",
      "slug": "before-after-bridge",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "cf79e98b-334b-40e6-a1a8-ca01660df47f",
      "evidence": "The slide shows a contrast between the current and future states, similar to a before-after-bridge.",
      "confidence": 0.6
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [
    {
      "to": 93,
      "from": 71,
      "name": "Before After",
      "slug": "21-before-after",
      "bestFor": "Product demos, process improvements, ROI justification",
      "matchId": "019dd95a-088b-72c8-b7e7-1920f0844597",
      "evidence": "Each function has (I/II) diagnosis ('current pain') and (II/II) implementation ('proposed model').",
      "position": 13,
      "objective": "Run each support function through diagnostic-then-target-state pattern",
      "structure": "The Old Way (Pain) -> The Moment of Change -> The New Way (Glory) -> The Measurable Delta",
      "confidence": 88,
      "description": "Show the dramatic contrast between the old way and the new way through side-by-side comparison"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}