{
  "kind": "all",
  "value": "all",
  "collectionKey": "slides:all:all:all-document-kinds:all-producers:all-orientations",
  "filters": {
    "documentKinds": [],
    "sourceTypes": [],
    "orientations": []
  },
  "total": 319975,
  "page": 150,
  "pageSize": 30,
  "pageCount": 10666,
  "rows": [
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 67,
      "slideType": "diagnosis",
      "function": "diagnose",
      "notes": "The slide uses a process flow diagram to illustrate the acquisition lifecycle and provides two columns of text detailing the requirements for market research and coordination.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/67",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-67",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 68,
      "slideType": "recommendation",
      "function": "recommend",
      "notes": "The slide uses a three-column structure to define the LKF, identify current issues, and propose a future implementation path.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/68",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-68",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 69,
      "slideType": "diagnosis",
      "function": "diagnose",
      "notes": "The slide discusses the need for continuous training to support category management implementation and suggests a dedicated resource for coordination.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/69",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-69",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 70,
      "slideType": "segmentation",
      "function": "decompose_segments",
      "notes": "The slide uses a 5x5 grid to display the categories. The text on the left outlines the methodology and limitations of the current categorization.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/70",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-70",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 71,
      "slideType": "data_table",
      "function": "analyze_data",
      "notes": "The slide uses a process flow (left to right) to explain how the total baseline is filtered down to an addressable amount of 1.057 billion DKK.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/71",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-71",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 72,
      "slideType": "diagnosis",
      "function": "diagnose",
      "notes": "The slide uses a two-column structure to contrast historical background with feasibility considerations.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/72",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-72",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 73,
      "slideType": "data_table",
      "function": "quantify_impact",
      "notes": "The slide uses a waterfall-style chart to show the baseline and revenue potential, alongside a table detailing savings percentages and revenue ranges.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/73",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-73",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 74,
      "slideType": "appendix_methodology",
      "function": "analyze_data",
      "notes": "The slide compares two bar charts showing baseline and revenue figures, with a text summary explaining the methodological differences in how the baseline is broken down.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/74",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-74",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 75,
      "slideType": "cost_structure",
      "function": "quantify_impact",
      "notes": "The chart distinguishes between one-time setup costs (light green) and recurring operational costs (dark green).",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/75",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-75",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 76,
      "slideType": "financial_analysis",
      "function": "quantify_impact",
      "notes": "The chart shows negative values for implementation costs in early years, transitioning to positive net revenue.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/76",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-76",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 77,
      "slideType": "risk_register",
      "function": "diagnose",
      "notes": "The slide uses a legend at the bottom to define the challenge levels represented by the circle icons.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/77",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-77",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 78,
      "slideType": "initiative_list",
      "function": "present_solution",
      "notes": "The slide is part of a series on efficiency proposals. It uses a structured table format to map initiatives to descriptions and outcomes.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/78",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-78",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 79,
      "slideType": "impact_sizing",
      "function": "quantify_impact",
      "notes": "The slide uses a structured table format to present baseline figures, scenario-based potential ranges, and a qualitative statement on geographic impact.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/79",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-79",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 80,
      "slideType": "financial_analysis",
      "function": "quantify_impact",
      "notes": "The slide uses a table to show the net potential over a 5-year period (2018-2022) and lists operational considerations.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/80",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-80",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 81,
      "slideType": "financial_analysis",
      "function": "quantify_impact",
      "notes": "The slide outlines a logic flow for adjusting financial projections based on existing vs. new procurement initiatives.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/81",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-81",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 82,
      "slideType": "implementation_plan",
      "function": "plan_implementation",
      "notes": "The slide uses a Gantt chart format to map activities against quarters and years, with specific markers for continuous implementation and potential realization.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/82",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-82",
      "loopMatches": [
        {
          "to": 82,
          "from": 54,
          "name": "Maturity Curve",
          "slug": "36-maturity-curve",
          "bestFor": "Digital transformation, capability building, benchmarking",
          "matchId": "019dd95a-088b-72c8-b7e2-4c1dbee5252b",
          "evidence": "Modenhedsanalyse with 5 development areas (page 61) plus best-in-class procurement framework (page 60).",
          "position": 3,
          "objective": "Build kategoristyring capability via maturity model gaps",
          "structure": "Current Maturity Level -> The Gap to Next Level -> Required Capabilities -> The Roadmap",
          "confidence": 86,
          "description": "Show where you are on a progression and what it takes to reach the next level"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 83,
      "slideType": "section_divider",
      "function": "transition",
      "notes": null,
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/83",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-83",
      "loopMatches": [],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 84,
      "slideType": "business_case",
      "function": "present_solution",
      "notes": "The slide uses a structured table format to present a business case for IT insourcing.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/84",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-84",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 85,
      "slideType": "roadmap",
      "function": "present_solution",
      "notes": "The slide uses a three-column structure (A, B, C) to represent a process or logical flow of the proposal development.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/85",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-85",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 86,
      "slideType": "situation_overview",
      "function": "establish_context",
      "notes": "The slide contrasts 2016 findings with current recruitment challenges and updated cost assumptions.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/86",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-86",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 87,
      "slideType": "scenario_analysis",
      "function": "compare_options",
      "notes": "The slide uses a table to map task types to headcount, then groups them into two distinct scenarios for outsourcing strategy.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/87",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-87",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 88,
      "slideType": "appendix_data",
      "function": "quantify_impact",
      "notes": "The waterfall chart shows the deduction of licenses and hardware costs and the addition of development consultant costs to reach the net addressable baseline.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/88",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-88",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 89,
      "slideType": "scenario_analysis",
      "function": "analyze_data",
      "notes": "Waterfall chart shows the breakdown of costs from total DeMars budget to addressable drift savings.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/89",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-89",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 90,
      "slideType": "scenario_analysis",
      "function": "compare_options",
      "notes": "Includes a waterfall chart for cost baseline and a scenario comparison table for recruitment, cost, and revenue.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/90",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-90",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 91,
      "slideType": "executive_summary",
      "function": "summarize",
      "notes": "The slide acts as a transition/summary page between detailed scenario analysis slides.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/91",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-91",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 92,
      "slideType": "implementation_plan",
      "function": "plan_implementation",
      "notes": "Includes a risk callout for SAP consultant turnover and financial benefit estimation.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/92",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-92",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 93,
      "slideType": "recommendation",
      "function": "recommend",
      "notes": "The slide uses a comparison table to highlight Scenario B, with a callout box explaining the rationale and a footer note addressing the primary risk.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/93",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-93",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 94,
      "slideType": "strategic_options",
      "function": "compare_options",
      "notes": "The slide compares three levels of insourcing (1-9, 10-18, 19-27 FTEs) with a recommendation for the middle option.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/94",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-94",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 95,
      "slideType": "financial_analysis",
      "function": "quantify_impact",
      "notes": "The slide details the methodology behind a 10-25% savings potential, referencing previous PA Consulting reports and Deloitte sensitivity analysis.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/95",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-95",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-e5735b54e9cc",
      "docSlug": "0798c0fb1aaf0664",
      "documentTitle": "Budgetanalyse af Forsvaret 2017 Materialesamling Del 2",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.445,
      "pageNumber": 96,
      "slideType": "financial_analysis",
      "function": "quantify_impact",
      "notes": "The slide outlines the financial impact of bringing SAP competencies in-house, including recruitment costs and potential savings.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": null,
      "slideHref": "/slides/019dd923-5ca1-7489-b634-e5735b54e9cc/96",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-e5735b54e9cc#slide-96",
      "loopMatches": [
        {
          "to": 97,
          "from": 84,
          "name": "Scenario Fork",
          "slug": "35-scenario-fork",
          "bestFor": "Strategic planning, risk analysis, board presentations",
          "matchId": "019dd95a-088b-72c8-b7e2-52e9a3c46a82",
          "evidence": "Scenario 1 (drift+vedl, fravalgt) vs scenario 2 (udvikling, 3 sub-scenarios).",
          "position": 4,
          "objective": "Compare insourcing scenarios for IT development",
          "structure": "The Decision Point -> Scenario A (If X) -> Scenario B (If Y) -> Scenario C (If Z) -> Recommendation",
          "confidence": 88,
          "description": "Present multiple futures based on different assumptions or decisions"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 321,
          "from": 19,
          "beatId": "019dd95a-0702-74a3-87da-2412ddc609c1",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Twelve effektiviseringsforslag with IPT, kategoristyring, IT, organisation, indkøb.",
          "position": 3,
          "confidence": 92,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 165,
          "from": 9,
          "beatId": "019dd95a-0702-74a3-87da-30a6df91c9fe",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Baselines, segmentations, current-state diagnoses dominate first half.",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    }
  ]
}