{
  "kind": "loop",
  "value": "19-pre-mortem",
  "collectionKey": "slides:loop:19-pre-mortem:all-document-kinds:all-producers:all-orientations",
  "filters": {
    "documentKinds": [],
    "sourceTypes": [],
    "orientations": []
  },
  "total": 96,
  "page": 1,
  "pageSize": 24,
  "pageCount": 4,
  "rows": [
    {
      "docId": "019dd923-5e88-73ef-bd5b-8e5933d78ad2",
      "docSlug": "cbd44e3e897e6a47",
      "documentTitle": "20240220 Barclays FY2023 FI Call Slides",
      "authorId": "Barclays",
      "authorName": "Barclays",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "equity_research",
      "sourceTypeLabel": "Equity research",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 12,
      "slideType": "impact_sizing",
      "function": "quantify_impact",
      "notes": "The slide uses a timeline-like structure to explain the components of RWA inflation.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Acknowledge regulatory headwind then present mitigation plan",
      "slideHref": "/slides/019dd923-5e88-73ef-bd5b-8e5933d78ad2/12",
      "deckHref": "/decks/019dd923-5e88-73ef-bd5b-8e5933d78ad2",
      "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd5b-8e5933d78ad2#slide-12",
      "loopMatches": [
        {
          "to": 13,
          "from": 12,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-08f7-737a-a002-b20fa9dccc55",
          "evidence": "p12 revised RWA inflation guidance (potential disaster) → p13 'no material impact' + mitigating actions",
          "position": 4,
          "objective": "Acknowledge regulatory headwind then present mitigation plan",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 13,
          "from": 12,
          "beatId": "019dd95a-07a6-74c7-9027-fa0a28789f65",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Problem & Complication",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Revised RWA inflation guidance + model migration headwinds",
          "position": 3,
          "confidence": 58,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 19,
          "from": 10,
          "beatId": "019dd95a-07a6-74c7-9028-09ab7285c19e",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Action (Now What)",
          "beatSlug": "triple-take-the-action-now-what",
          "evidence": "Balance-sheet deep dive supporting the buy-and-hold thesis",
          "position": 3,
          "confidence": 52,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5e88-73ef-bd5b-8e5933d78ad2",
      "docSlug": "cbd44e3e897e6a47",
      "documentTitle": "20240220 Barclays FY2023 FI Call Slides",
      "authorId": "Barclays",
      "authorName": "Barclays",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "equity_research",
      "sourceTypeLabel": "Equity research",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 13,
      "slideType": "diagnosis",
      "function": "diagnose",
      "notes": "The slide uses a comparative structure to explain the rationale behind the RWA increase.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Acknowledge regulatory headwind then present mitigation plan",
      "slideHref": "/slides/019dd923-5e88-73ef-bd5b-8e5933d78ad2/13",
      "deckHref": "/decks/019dd923-5e88-73ef-bd5b-8e5933d78ad2",
      "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd5b-8e5933d78ad2#slide-13",
      "loopMatches": [
        {
          "to": 13,
          "from": 12,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-08f7-737a-a002-b20fa9dccc55",
          "evidence": "p12 revised RWA inflation guidance (potential disaster) → p13 'no material impact' + mitigating actions",
          "position": 4,
          "objective": "Acknowledge regulatory headwind then present mitigation plan",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 13,
          "from": 12,
          "beatId": "019dd95a-07a6-74c7-9027-fa0a28789f65",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Problem & Complication",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Revised RWA inflation guidance + model migration headwinds",
          "position": 3,
          "confidence": 58,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 19,
          "from": 10,
          "beatId": "019dd95a-07a6-74c7-9028-09ab7285c19e",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Action (Now What)",
          "beatSlug": "triple-take-the-action-now-what",
          "evidence": "Balance-sheet deep dive supporting the buy-and-hold thesis",
          "position": 3,
          "confidence": 52,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-d97b47181c2f",
      "docSlug": "df6f7ffbb24bfbd2",
      "documentTitle": "Banking: The future is back",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 42,
      "slideType": "section_divider",
      "function": "transition",
      "notes": "The slide uses a stylized abstract background and a photo of a professional in a workspace.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Warn platform providers about disruption risk",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-d97b47181c2f/42",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f#slide-42",
      "loopMatches": [
        {
          "to": 45,
          "from": 42,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fd-712f-b772-e95060625d4d",
          "evidence": "Divider invokes 'innovator's dilemma'; p.44 says next-gen platforms have 'long way to go'; p.45 forecasts who survives",
          "position": 11,
          "objective": "Warn platform providers about disruption risk",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 45,
          "from": 6,
          "beatId": "019dd95a-0680-7418-8209-303a18385e57",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Ten trend chapters with charts/data and 'so what' action titles",
          "position": 2,
          "confidence": 88,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        },
        {
          "to": 45,
          "from": 38,
          "beatId": "019dd95a-0680-7418-8209-46547984dd73",
          "arcName": "Voyage and Return",
          "arcSlug": "voyage-return",
          "beatName": "The Return",
          "beatSlug": "voyage-return-the-return",
          "evidence": "Trends 9-10 modernize legacy code and platforms — back to fundamentals",
          "position": 4,
          "confidence": 62,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-d97b47181c2f",
      "docSlug": "df6f7ffbb24bfbd2",
      "documentTitle": "Banking: The future is back",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 43,
      "slideType": "industry_trends",
      "function": "summarize",
      "notes": "The slide discusses the impact of GenAI on banking platforms, citing Klarna, Salesforce, and Adobe as examples of the shift toward composable architectures.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Warn platform providers about disruption risk",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-d97b47181c2f/43",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f#slide-43",
      "loopMatches": [
        {
          "to": 45,
          "from": 42,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fd-712f-b772-e95060625d4d",
          "evidence": "Divider invokes 'innovator's dilemma'; p.44 says next-gen platforms have 'long way to go'; p.45 forecasts who survives",
          "position": 11,
          "objective": "Warn platform providers about disruption risk",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 45,
          "from": 6,
          "beatId": "019dd95a-0680-7418-8209-303a18385e57",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Ten trend chapters with charts/data and 'so what' action titles",
          "position": 2,
          "confidence": 88,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        },
        {
          "to": 45,
          "from": 38,
          "beatId": "019dd95a-0680-7418-8209-46547984dd73",
          "arcName": "Voyage and Return",
          "arcSlug": "voyage-return",
          "beatName": "The Return",
          "beatSlug": "voyage-return-the-return",
          "evidence": "Trends 9-10 modernize legacy code and platforms — back to fundamentals",
          "position": 4,
          "confidence": 62,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-d97b47181c2f",
      "docSlug": "df6f7ffbb24bfbd2",
      "documentTitle": "Banking: The future is back",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 44,
      "slideType": "key_messages",
      "function": "summarize",
      "notes": "The slide uses a split layout with text on the left and a decorative abstract background on the right. It includes a quote from Sridhar Ramaswamy.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Warn platform providers about disruption risk",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-d97b47181c2f/44",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f#slide-44",
      "loopMatches": [
        {
          "to": 45,
          "from": 42,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fd-712f-b772-e95060625d4d",
          "evidence": "Divider invokes 'innovator's dilemma'; p.44 says next-gen platforms have 'long way to go'; p.45 forecasts who survives",
          "position": 11,
          "objective": "Warn platform providers about disruption risk",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 45,
          "from": 6,
          "beatId": "019dd95a-0680-7418-8209-303a18385e57",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Ten trend chapters with charts/data and 'so what' action titles",
          "position": 2,
          "confidence": 88,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        },
        {
          "to": 45,
          "from": 38,
          "beatId": "019dd95a-0680-7418-8209-46547984dd73",
          "arcName": "Voyage and Return",
          "arcSlug": "voyage-return",
          "beatName": "The Return",
          "beatSlug": "voyage-return-the-return",
          "evidence": "Trends 9-10 modernize legacy code and platforms — back to fundamentals",
          "position": 4,
          "confidence": 62,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-d97b47181c2f",
      "docSlug": "df6f7ffbb24bfbd2",
      "documentTitle": "Banking: The future is back",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 45,
      "slideType": "recommendation",
      "function": "recommend",
      "notes": "The slide uses a stylized abstract background. The recommendations focus on ecosystem partnerships, build-vs-buy strategy, and modular pricing.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Warn platform providers about disruption risk",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-d97b47181c2f/45",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-d97b47181c2f#slide-45",
      "loopMatches": [
        {
          "to": 45,
          "from": 42,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fd-712f-b772-e95060625d4d",
          "evidence": "Divider invokes 'innovator's dilemma'; p.44 says next-gen platforms have 'long way to go'; p.45 forecasts who survives",
          "position": 11,
          "objective": "Warn platform providers about disruption risk",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 45,
          "from": 6,
          "beatId": "019dd95a-0680-7418-8209-303a18385e57",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Ten trend chapters with charts/data and 'so what' action titles",
          "position": 2,
          "confidence": 88,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        },
        {
          "to": 45,
          "from": 38,
          "beatId": "019dd95a-0680-7418-8209-46547984dd73",
          "arcName": "Voyage and Return",
          "arcSlug": "voyage-return",
          "beatName": "The Return",
          "beatSlug": "voyage-return-the-return",
          "evidence": "Trends 9-10 modernize legacy code and platforms — back to fundamentals",
          "position": 4,
          "confidence": 62,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5e88-73ef-bd5b-6bedd64d9e01",
      "docSlug": "71ac17290f26dcd4",
      "documentTitle": "Bread Financial  Barclays Global Financial Services Conference",
      "authorId": "Barclays",
      "authorName": "Barclays",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "equity_research",
      "sourceTypeLabel": "Equity research",
      "presentationDate": null,
      "orientation": "portrait",
      "aspectRatio": 0.706,
      "pageNumber": 9,
      "slideType": "appendix",
      "function": "summarize",
      "notes": "Transcript format, likely from an earnings call or investor presentation.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Reassure on tail risk via stress-testing posture",
      "slideHref": "/slides/019dd923-5e88-73ef-bd5b-6bedd64d9e01/9",
      "deckHref": "/decks/019dd923-5e88-73ef-bd5b-6bedd64d9e01",
      "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd5b-6bedd64d9e01#slide-9",
      "loopMatches": [
        {
          "to": 10,
          "from": 9,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-08f7-737a-a004-2f75ec4b49b8",
          "evidence": "We stress test our portfolios... assumptions of how it could perform if certain things go bad",
          "position": 4,
          "objective": "Reassure on tail risk via stress-testing posture",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 50,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 12,
          "from": 8,
          "beatId": "019dd95a-07a6-74c7-9029-ac06f61fa106",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Action (Now What)",
          "beatSlug": "triple-take-the-action-now-what",
          "evidence": "Green shoots outlook, stress testing, unique vs U.S. peers, 8% coverage — forward posture",
          "position": 3,
          "confidence": 45,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5e88-73ef-bd5b-6bedd64d9e01",
      "docSlug": "71ac17290f26dcd4",
      "documentTitle": "Bread Financial  Barclays Global Financial Services Conference",
      "authorId": "Barclays",
      "authorName": "Barclays",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "equity_research",
      "sourceTypeLabel": "Equity research",
      "presentationDate": null,
      "orientation": "portrait",
      "aspectRatio": 0.706,
      "pageNumber": 10,
      "slideType": "testimonial",
      "function": "summarize",
      "notes": "This is a transcript page from an earnings call or investor presentation.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Reassure on tail risk via stress-testing posture",
      "slideHref": "/slides/019dd923-5e88-73ef-bd5b-6bedd64d9e01/10",
      "deckHref": "/decks/019dd923-5e88-73ef-bd5b-6bedd64d9e01",
      "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd5b-6bedd64d9e01#slide-10",
      "loopMatches": [
        {
          "to": 10,
          "from": 9,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-08f7-737a-a004-2f75ec4b49b8",
          "evidence": "We stress test our portfolios... assumptions of how it could perform if certain things go bad",
          "position": 4,
          "objective": "Reassure on tail risk via stress-testing posture",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 50,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 12,
          "from": 8,
          "beatId": "019dd95a-07a6-74c7-9029-ac06f61fa106",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Action (Now What)",
          "beatSlug": "triple-take-the-action-now-what",
          "evidence": "Green shoots outlook, stress testing, unique vs U.S. peers, 8% coverage — forward posture",
          "position": 3,
          "confidence": 45,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b63a-7bc1c129a67d",
      "docSlug": "6c965738d0a902ed",
      "documentTitle": "GEM Outlook 2023-2027 Hong Kong",
      "authorId": "PwC",
      "authorName": "PwC",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 30,
      "slideType": "key_messages",
      "function": "present_framework",
      "notes": "The slide uses two distinct boxes to categorize 'Strategy' and 'Responsible Practices'.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Pre-empt risks of unmanaged GenAI adoption",
      "slideHref": "/slides/019dd923-5ca1-7489-b63a-7bc1c129a67d/30",
      "deckHref": "/decks/019dd923-5ca1-7489-b63a-7bc1c129a67d",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b63a-7bc1c129a67d#slide-30",
      "loopMatches": [
        {
          "to": 31,
          "from": 30,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019de9c6-b62f-7186-bbc9-c30d643c43d4",
          "evidence": "p30 Responsible AI pillars + G7 governance news; p31 risk-based priorities and quick-win advice.",
          "position": 7,
          "objective": "Pre-empt risks of unmanaged GenAI adoption",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 65,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 30,
          "from": 25,
          "beatId": "019de9c6-b444-73fb-8948-79fc2232b8f6",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": null,
          "evidence": "GenAI section reframes outlook with disruptive technology lens.",
          "position": 2,
          "confidence": 70,
          "parentBeatName": null,
          "parentBeatSlug": null
        },
        {
          "to": 30,
          "from": 10,
          "beatId": "019de9c6-b515-7103-85b2-9346e72a41f4",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Evidence & Proof",
          "beatSlug": null,
          "evidence": "Segment deep dives plus GenAI use cases.",
          "position": 4,
          "confidence": 45,
          "parentBeatName": null,
          "parentBeatSlug": null
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b63a-7bc1c129a67d",
      "docSlug": "6c965738d0a902ed",
      "documentTitle": "GEM Outlook 2023-2027 Hong Kong",
      "authorId": "PwC",
      "authorName": "PwC",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 31,
      "slideType": "initiative_list",
      "function": "recommend",
      "notes": null,
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Pre-empt risks of unmanaged GenAI adoption",
      "slideHref": "/slides/019dd923-5ca1-7489-b63a-7bc1c129a67d/31",
      "deckHref": "/decks/019dd923-5ca1-7489-b63a-7bc1c129a67d",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b63a-7bc1c129a67d#slide-31",
      "loopMatches": [
        {
          "to": 31,
          "from": 30,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019de9c6-b62f-7186-bbc9-c30d643c43d4",
          "evidence": "p30 Responsible AI pillars + G7 governance news; p31 risk-based priorities and quick-win advice.",
          "position": 7,
          "objective": "Pre-empt risks of unmanaged GenAI adoption",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 65,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 31,
          "from": 31,
          "beatId": "019de9c6-b469-73bc-9e17-f87efc8cfd46",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Action (Now What)",
          "beatSlug": null,
          "evidence": "Slide 31 'Key considerations for adopting Generative AI'.",
          "position": 3,
          "confidence": 70,
          "parentBeatName": null,
          "parentBeatSlug": null
        },
        {
          "to": 31,
          "from": 31,
          "beatId": "019de9c6-b539-70ad-903c-51969c71cf5e",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Impact & Next Steps",
          "beatSlug": null,
          "evidence": "Four key considerations for GenAI adoption.",
          "position": 5,
          "confidence": 45,
          "parentBeatName": null,
          "parentBeatSlug": null
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b635-efee526b2162",
      "docSlug": "6ebe7bc3c470921e",
      "documentTitle": "Global Private Equity Report 2015",
      "authorId": "Bain",
      "authorName": "Bain",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "portrait",
      "aspectRatio": 0.773,
      "pageNumber": 50,
      "slideType": "industry_trends",
      "function": "establish_context",
      "notes": "The slide is a text-heavy page from a Bain report, focusing on European macro-economic risks.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Pre-mortem the eurozone breakup scenario",
      "slideHref": "/slides/019dd923-5ca1-7489-b635-efee526b2162/50",
      "deckHref": "/decks/019dd923-5ca1-7489-b635-efee526b2162",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b635-efee526b2162#slide-50",
      "loopMatches": [
        {
          "to": 51,
          "from": 50,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088c-724c-b312-466f6230437e",
          "evidence": "Bain Macro Trends Group warns of 'partial breakup of the eurozone toward the end of the decade'.",
          "position": 8,
          "objective": "Pre-mortem the eurozone breakup scenario",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 78,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 51,
          "from": 29,
          "beatId": "019dd95a-07a4-702a-b0b2-8d12c1cef02c",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Section 2 four forces: capital superabundance, shadow capital, US, Europe",
          "position": 3,
          "confidence": 82,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 58,
          "from": 29,
          "beatId": "019dd95a-07a5-761b-9143-8438c4caf57f",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Section 2: dynamics that will shape PE in 2015+",
          "position": 2,
          "confidence": 70,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b635-efee526b2162",
      "docSlug": "6ebe7bc3c470921e",
      "documentTitle": "Global Private Equity Report 2015",
      "authorId": "Bain",
      "authorName": "Bain",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "portrait",
      "aspectRatio": 0.773,
      "pageNumber": 51,
      "slideType": "executive_summary",
      "function": "summarize",
      "notes": "The slide is a text-heavy page from a report, outlining potential Eurozone instability and its implications for PE investment strategies.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Pre-mortem the eurozone breakup scenario",
      "slideHref": "/slides/019dd923-5ca1-7489-b635-efee526b2162/51",
      "deckHref": "/decks/019dd923-5ca1-7489-b635-efee526b2162",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b635-efee526b2162#slide-51",
      "loopMatches": [
        {
          "to": 51,
          "from": 50,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088c-724c-b312-466f6230437e",
          "evidence": "Bain Macro Trends Group warns of 'partial breakup of the eurozone toward the end of the decade'.",
          "position": 8,
          "objective": "Pre-mortem the eurozone breakup scenario",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 78,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 51,
          "from": 29,
          "beatId": "019dd95a-07a4-702a-b0b2-8d12c1cef02c",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Solution & Approach",
          "beatSlug": "consultants-gambit-solution-approach",
          "evidence": "Section 2 four forces: capital superabundance, shadow capital, US, Europe",
          "position": 3,
          "confidence": 82,
          "parentBeatName": "Turn",
          "parentBeatSlug": "turn"
        },
        {
          "to": 58,
          "from": 29,
          "beatId": "019dd95a-07a5-761b-9143-8438c4caf57f",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Section 2: dynamics that will shape PE in 2015+",
          "position": 2,
          "confidence": 70,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-aaa97df31ab3",
      "docSlug": "39397d6b7bf63e80",
      "documentTitle": "Navigating uncertain skies Commercial Aerospace Insight Report",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 21,
      "slideType": "transition",
      "function": "transition",
      "notes": null,
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface risk concerns leaders should plan against",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-aaa97df31ab3/21",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-aaa97df31ab3",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-aaa97df31ab3#slide-21",
      "loopMatches": [
        {
          "to": 22,
          "from": 21,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fe-70ce-8d38-29f7aaa57e32",
          "evidence": "Divider 'what's keeping leaders up at night' + risk concern table mapping factors × time horizons",
          "position": 6,
          "objective": "Surface risk concerns leaders should plan against",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 22,
          "from": 16,
          "beatId": "019dd95a-0680-7418-820d-da1d5f06379a",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Evidence & Proof",
          "beatSlug": "consultants-gambit-evidence-proof",
          "evidence": "Airline profits, production index, cost outlook charts, risk concern matrix",
          "position": 4,
          "confidence": 78,
          "parentBeatName": "Evidence",
          "parentBeatSlug": "evidence"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-aaa97df31ab3",
      "docSlug": "39397d6b7bf63e80",
      "documentTitle": "Navigating uncertain skies Commercial Aerospace Insight Report",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 22,
      "slideType": "risk_register",
      "function": "diagnose",
      "notes": "The table uses a heatmap-style color coding for future expectations (purple for 'Similar', light purple for 'Greater').",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface risk concerns leaders should plan against",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-aaa97df31ab3/22",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-aaa97df31ab3",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-aaa97df31ab3#slide-22",
      "loopMatches": [
        {
          "to": 22,
          "from": 21,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fe-70ce-8d38-29f7aaa57e32",
          "evidence": "Divider 'what's keeping leaders up at night' + risk concern table mapping factors × time horizons",
          "position": 6,
          "objective": "Surface risk concerns leaders should plan against",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 72,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 22,
          "from": 16,
          "beatId": "019dd95a-0680-7418-820d-da1d5f06379a",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Evidence & Proof",
          "beatSlug": "consultants-gambit-evidence-proof",
          "evidence": "Airline profits, production index, cost outlook charts, risk concern matrix",
          "position": 4,
          "confidence": 78,
          "parentBeatName": "Evidence",
          "parentBeatSlug": "evidence"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-e8135a04b3c6",
      "docSlug": "f67d9cb3253945a0",
      "documentTitle": "REINVENTION WITH GENERATIVE AI: CalPERS",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.776,
      "pageNumber": 7,
      "slideType": "pain_points",
      "function": "frame_problem",
      "notes": null,
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface risks then prevention plan",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-e8135a04b3c6/7",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-e8135a04b3c6",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-e8135a04b3c6#slide-7",
      "loopMatches": [
        {
          "to": 8,
          "from": 7,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fe-70ce-8d38-7cd8cecbcc35",
          "evidence": "p.7 lists 5 risks/disasters; p.8 follows with 5 best-practice preventions",
          "position": 2,
          "objective": "Surface risks then prevention plan",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 80,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 8,
          "from": 3,
          "beatId": "019dd95a-0680-7418-820e-35b960ead882",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Situation & Context",
          "beatSlug": "consultants-gambit-situation-context",
          "evidence": "Section 01 'What is GenAI?' defines tech, evolution, basics, creativity",
          "position": 1,
          "confidence": 90,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        },
        {
          "to": 8,
          "from": 3,
          "beatId": "019dd95a-0680-7418-820e-492fcf52a6fb",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Section 01 defines what GenAI is",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5de0-76bd-a167-e8135a04b3c6",
      "docSlug": "f67d9cb3253945a0",
      "documentTitle": "REINVENTION WITH GENERATIVE AI: CalPERS",
      "authorId": "Accenture",
      "authorName": "Accenture",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.776,
      "pageNumber": 8,
      "slideType": "initiative_list",
      "function": "present_solution",
      "notes": "The slide uses a numbered hexagonal icon-based layout to present five distinct pillars of AI strategy.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface risks then prevention plan",
      "slideHref": "/slides/019dd923-5de0-76bd-a167-e8135a04b3c6/8",
      "deckHref": "/decks/019dd923-5de0-76bd-a167-e8135a04b3c6",
      "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-e8135a04b3c6#slide-8",
      "loopMatches": [
        {
          "to": 8,
          "from": 7,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-07fe-70ce-8d38-7cd8cecbcc35",
          "evidence": "p.7 lists 5 risks/disasters; p.8 follows with 5 best-practice preventions",
          "position": 2,
          "objective": "Surface risks then prevention plan",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 80,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 8,
          "from": 3,
          "beatId": "019dd95a-0680-7418-820e-35b960ead882",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Situation & Context",
          "beatSlug": "consultants-gambit-situation-context",
          "evidence": "Section 01 'What is GenAI?' defines tech, evolution, basics, creativity",
          "position": 1,
          "confidence": 90,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        },
        {
          "to": 8,
          "from": 3,
          "beatId": "019dd95a-0680-7418-820e-492fcf52a6fb",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Facts (What)",
          "beatSlug": "triple-take-the-facts-what",
          "evidence": "Section 01 defines what GenAI is",
          "position": 1,
          "confidence": 70,
          "parentBeatName": "Setup",
          "parentBeatSlug": "setup"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-bc8e3e952c51",
      "docSlug": "bc9c22881d997435",
      "documentTitle": "Reshaping NYCHA support functions",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.401,
      "pageNumber": 60,
      "slideType": "risk_register",
      "function": "plan_implementation",
      "notes": "The slide acts as a transition to implementation/risk management.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface ongoing risks/challenges and the structures put in place to address them",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-bc8e3e952c51/60",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51#slide-60",
      "loopMatches": [
        {
          "to": 64,
          "from": 60,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088b-72c8-b7e7-110fb9622709",
          "evidence": "p61-63 'continued success requires NYCHA addresses ongoing challenges and risks (I-III/III)'.",
          "position": 11,
          "objective": "Surface ongoing risks/challenges and the structures put in place to address them",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 85,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 68,
          "from": 50,
          "beatId": "019dd95a-0702-74a3-87df-f39a4bb1bd76",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Impact & Next Steps",
          "beatSlug": "consultants-gambit-impact-next-steps",
          "evidence": "Implementation plan, EPMO, risks, progress to date — closes with 'continued commitment'.",
          "position": 5,
          "confidence": 95,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-bc8e3e952c51",
      "docSlug": "bc9c22881d997435",
      "documentTitle": "Reshaping NYCHA support functions",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.401,
      "pageNumber": 61,
      "slideType": "risk_register",
      "function": "diagnose",
      "notes": "The slide uses a structured table format to map risks to mitigation actions.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface ongoing risks/challenges and the structures put in place to address them",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-bc8e3e952c51/61",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51#slide-61",
      "loopMatches": [
        {
          "to": 64,
          "from": 60,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088b-72c8-b7e7-110fb9622709",
          "evidence": "p61-63 'continued success requires NYCHA addresses ongoing challenges and risks (I-III/III)'.",
          "position": 11,
          "objective": "Surface ongoing risks/challenges and the structures put in place to address them",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 85,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 68,
          "from": 50,
          "beatId": "019dd95a-0702-74a3-87df-f39a4bb1bd76",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Impact & Next Steps",
          "beatSlug": "consultants-gambit-impact-next-steps",
          "evidence": "Implementation plan, EPMO, risks, progress to date — closes with 'continued commitment'.",
          "position": 5,
          "confidence": 95,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-bc8e3e952c51",
      "docSlug": "bc9c22881d997435",
      "documentTitle": "Reshaping NYCHA support functions",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.401,
      "pageNumber": 62,
      "slideType": "risk_register",
      "function": "diagnose",
      "notes": "Part of a series of slides on risk mitigation.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface ongoing risks/challenges and the structures put in place to address them",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-bc8e3e952c51/62",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51#slide-62",
      "loopMatches": [
        {
          "to": 64,
          "from": 60,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088b-72c8-b7e7-110fb9622709",
          "evidence": "p61-63 'continued success requires NYCHA addresses ongoing challenges and risks (I-III/III)'.",
          "position": 11,
          "objective": "Surface ongoing risks/challenges and the structures put in place to address them",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 85,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 68,
          "from": 50,
          "beatId": "019dd95a-0702-74a3-87df-f39a4bb1bd76",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Impact & Next Steps",
          "beatSlug": "consultants-gambit-impact-next-steps",
          "evidence": "Implementation plan, EPMO, risks, progress to date — closes with 'continued commitment'.",
          "position": 5,
          "confidence": 95,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-bc8e3e952c51",
      "docSlug": "bc9c22881d997435",
      "documentTitle": "Reshaping NYCHA support functions",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.401,
      "pageNumber": 63,
      "slideType": "risk_register",
      "function": "diagnose",
      "notes": "Part 3 of 3 in a series of risk slides.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface ongoing risks/challenges and the structures put in place to address them",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-bc8e3e952c51/63",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51#slide-63",
      "loopMatches": [
        {
          "to": 64,
          "from": 60,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088b-72c8-b7e7-110fb9622709",
          "evidence": "p61-63 'continued success requires NYCHA addresses ongoing challenges and risks (I-III/III)'.",
          "position": 11,
          "objective": "Surface ongoing risks/challenges and the structures put in place to address them",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 85,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 68,
          "from": 50,
          "beatId": "019dd95a-0702-74a3-87df-f39a4bb1bd76",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Impact & Next Steps",
          "beatSlug": "consultants-gambit-impact-next-steps",
          "evidence": "Implementation plan, EPMO, risks, progress to date — closes with 'continued commitment'.",
          "position": 5,
          "confidence": 95,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-bc8e3e952c51",
      "docSlug": "bc9c22881d997435",
      "documentTitle": "Reshaping NYCHA support functions",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.401,
      "pageNumber": 64,
      "slideType": "risk_register",
      "function": "present_solution",
      "notes": "The slide uses a checkmark matrix to show the relationship between mitigation tools and identified risks.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface ongoing risks/challenges and the structures put in place to address them",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-bc8e3e952c51/64",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-bc8e3e952c51#slide-64",
      "loopMatches": [
        {
          "to": 64,
          "from": 60,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088b-72c8-b7e7-110fb9622709",
          "evidence": "p61-63 'continued success requires NYCHA addresses ongoing challenges and risks (I-III/III)'.",
          "position": 11,
          "objective": "Surface ongoing risks/challenges and the structures put in place to address them",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 85,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 68,
          "from": 50,
          "beatId": "019dd95a-0702-74a3-87df-f39a4bb1bd76",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Impact & Next Steps",
          "beatSlug": "consultants-gambit-impact-next-steps",
          "evidence": "Implementation plan, EPMO, risks, progress to date — closes with 'continued commitment'.",
          "position": 5,
          "confidence": 95,
          "parentBeatName": "Resolution",
          "parentBeatSlug": "resolution"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-85dd78267d79",
      "docSlug": "2deda760ae33148f",
      "documentTitle": "The CEO’s Roadmap on Generative AI",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 26,
      "slideType": "risk_register",
      "function": "frame_problem",
      "notes": "The slide uses a 'collage' of media clippings to establish the urgency and breadth of AI-related risks.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface critical risks before adoption",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-85dd78267d79/26",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-85dd78267d79",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-85dd78267d79#slide-26",
      "loopMatches": [
        {
          "to": 28,
          "from": 26,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088c-724c-b30e-1b91f3758a97",
          "evidence": "Real-world risk incidents -> RAI fundamental shifts -> register of critical risks to be wary of.",
          "position": 6,
          "objective": "Surface critical risks before adoption",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 78,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 30,
          "from": 26,
          "beatId": "019dd95a-0702-74a3-87e1-8506d52b75cf",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Evidence & Proof",
          "beatSlug": "consultants-gambit-evidence-proof",
          "evidence": "Pillar 3 grounded in real-world risks, severity 2x2, resolution timeline",
          "position": 4,
          "confidence": 90,
          "parentBeatName": "Evidence",
          "parentBeatSlug": "evidence"
        },
        {
          "to": 28,
          "from": 10,
          "beatId": "019dd95a-0702-74a3-87e1-93235f2deb66",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Use case selection, workforce reshape, risk surface",
          "position": 2,
          "confidence": 60,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-85dd78267d79",
      "docSlug": "2deda760ae33148f",
      "documentTitle": "The CEO’s Roadmap on Generative AI",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 27,
      "slideType": "diagnosis",
      "function": "diagnose",
      "notes": "The slide uses a 2x2 grid layout to contrast drivers (left) with their resulting risks (right).",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface critical risks before adoption",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-85dd78267d79/27",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-85dd78267d79",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-85dd78267d79#slide-27",
      "loopMatches": [
        {
          "to": 28,
          "from": 26,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088c-724c-b30e-1b91f3758a97",
          "evidence": "Real-world risk incidents -> RAI fundamental shifts -> register of critical risks to be wary of.",
          "position": 6,
          "objective": "Surface critical risks before adoption",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 78,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 30,
          "from": 26,
          "beatId": "019dd95a-0702-74a3-87e1-8506d52b75cf",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Evidence & Proof",
          "beatSlug": "consultants-gambit-evidence-proof",
          "evidence": "Pillar 3 grounded in real-world risks, severity 2x2, resolution timeline",
          "position": 4,
          "confidence": 90,
          "parentBeatName": "Evidence",
          "parentBeatSlug": "evidence"
        },
        {
          "to": 28,
          "from": 10,
          "beatId": "019dd95a-0702-74a3-87e1-93235f2deb66",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Use case selection, workforce reshape, risk surface",
          "position": 2,
          "confidence": 60,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    },
    {
      "docId": "019dd923-5ca1-7489-b634-85dd78267d79",
      "docSlug": "2deda760ae33148f",
      "documentTitle": "The CEO’s Roadmap on Generative AI",
      "authorId": "BCG",
      "authorName": "BCG",
      "documentKindSlug": "consulting-deck",
      "documentKindLabel": "Consulting deck",
      "sourceTypeSlug": "strategy_consulting",
      "sourceTypeLabel": "Strategy consulting",
      "presentationDate": null,
      "orientation": "landscape",
      "aspectRatio": 1.778,
      "pageNumber": 28,
      "slideType": "risk_register",
      "function": "diagnose",
      "notes": "The slide uses a grid layout to categorize distinct risk vectors.",
      "imagePath": null,
      "matchCount": 1,
      "evidence": "Surface critical risks before adoption",
      "slideHref": "/slides/019dd923-5ca1-7489-b634-85dd78267d79/28",
      "deckHref": "/decks/019dd923-5ca1-7489-b634-85dd78267d79",
      "deckAnchorHref": "/decks/019dd923-5ca1-7489-b634-85dd78267d79#slide-28",
      "loopMatches": [
        {
          "to": 28,
          "from": 26,
          "name": "Pre Mortem",
          "slug": "19-pre-mortem",
          "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
          "matchId": "019dd95a-088c-724c-b30e-1b91f3758a97",
          "evidence": "Real-world risk incidents -> RAI fundamental shifts -> register of critical risks to be wary of.",
          "position": 6,
          "objective": "Surface critical risks before adoption",
          "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
          "confidence": 78,
          "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
        }
      ],
      "arcBeatMatches": [
        {
          "to": 30,
          "from": 26,
          "beatId": "019dd95a-0702-74a3-87e1-8506d52b75cf",
          "arcName": "The Consultant's Gambit",
          "arcSlug": "consultants-gambit",
          "beatName": "Evidence & Proof",
          "beatSlug": "consultants-gambit-evidence-proof",
          "evidence": "Pillar 3 grounded in real-world risks, severity 2x2, resolution timeline",
          "position": 4,
          "confidence": 90,
          "parentBeatName": "Evidence",
          "parentBeatSlug": "evidence"
        },
        {
          "to": 28,
          "from": 10,
          "beatId": "019dd95a-0702-74a3-87e1-93235f2deb66",
          "arcName": "The Triple Take",
          "arcSlug": "triple-take",
          "beatName": "The Implications (So What)",
          "beatSlug": "triple-take-the-implications-so-what",
          "evidence": "Use case selection, workforce reshape, risk surface",
          "position": 2,
          "confidence": 60,
          "parentBeatName": "Reflection",
          "parentBeatSlug": "reflection"
        }
      ],
      "imagePathAlt": null,
      "thumbSrc": null,
      "thumbSrcAlt": null,
      "locked": true
    }
  ]
}